Job completed for Rivers
Completion date: August 15, 2023
Location: Baton Rouge, LA
Why did the customer contact us?
Electrical fire caused from a power surge, which was caused by a nearby lightning strike.
Set up client in Mainstay Inn nearby.
Fire department pulled electrical meter
Fire was in the loft of the house, fire dept had to come back after initial incident to stop fire.
Client said there are multiple rooms with ceilings collapsed.
Went through onboarding conversations with customer. explained the size of the project as well as the demo scope that project will become. Customer was understanding.
Kevin contacting Guarantee about pack out
Kyle contacting Hilton about demo and roof tarp
Solutions provided:
Source: Electrical fire- Soot damage spread throughout the first and second floors. Heaviest damage in kitchen. All rooms on both floors affected Next steps: 1) Contacted IEH for soot testing and protocol to be performed on 5/1 or 5/2. 2) Contents packet out to begin. Need Ozone and cleaning. Salvageable clothing to be treated with Ozone and sent to be dry cleaned. Window treatments as well. Artwork will need to be packed out and cleaned. 3) After contents moved offsite, initial demo and structural cleaning to begin. 4) HVAC to be replaced. 5) Garage has soot damage as well, will need to be cleaned during pack out.