Recent Jobs For United Fire & Water

Commercial Business

July 29, 2020 | Madisonville, LA

setup equipment 4 fans, 1 net. air and 1 DH, this will be a 2 to 3 day dry time. demoed entire bathroom due to water damage. complete remodel.

Tiffany D.

July 29, 2020 | Madisonville, LA

inspected carpet found wet in multiple locations. added 8 fans, 1 air scrubber and 1 dehumidifier. removed all carpet from living room and 12" flood cut on drywall in living room .

Daniel T.

July 28, 2020 | Baton Rouge, LA

Set up three fans, 2 DeHumidifiers, and two neg air in the bathroom. Left machines run for four days and retested everything and dry reading throughout.

Lionel B.

July 14, 2020 | Breaux Bridge, LA

Set up 17 airmovers, 3 dehu's, and 3 scrubbers. removed tile and carpet, cleaned and disinfected walls and floor. will leave for 8 days and retest daily. after 8 days everything is dry and will start installing new caret and tile floor.

Pat H.

July 14, 2020 | Baton Rouge, LA

step up 7 fans 2 dehumidifiers and 2 air scrubbers. after 3 days everything is dry. started disinfecting walls and floor. completed disinfecting and remodel. installed new toilet and tile floor.

Matthew W.

July 14, 2020 | Madisonville, LA

set up 2 neg. Air and 2 DH, on this job, been going for 8 days and we still have high readings in entire house. due to humid weather. 8 more days and entire house is dry.

Peter G.

July 8, 2020 | Baton Rouge, LA

Started the drying, put in 11 fans, 2 D.H and neg. Air mover. Some carpet, wood floor, wall, ceiling and trim are wet. dropped ceiling, pulled crown, removed some baseboard. 11 fans 2 DH, 2 neg. Air fans and met system with 3 mets the job dry time were 4 days. We remove some base in ...

Rachel I.

July 6, 2020 | Baton Rouge, LA

We investigate and found a small leak in on of the plumbing lines. set up a dehumidifier and air mover. fixed the leak, replaced drywall and everything has been dry for a week.

Jeremy W.

July 6, 2020 | Livingston, LA

set up a D.H. and neg. air fan. no demo was needed. a few day of air movement and everything was dry.

Carol N.

July 3, 2020 | Baton Rouge, LA

Removing the following from the kitchen/breakfast area and laundry room. -Sleepers -Subfloor -Flooring -Cabinets - Counters. Need air scrubber and negative air. Left machines on to circulate air and dry everything. Once dry, we completely remodeled the entire kitchen and Laundry.

Fara M.

July 2, 2020 | Baton Rouge, LA

Set up 1 neg air fan and 1 DH, coming tomorrow and do the mold cleaning. Cleaned and disinfected mold area. shot in blow in-insulation and homeowner finished the remodel.

Rachel M

June 26, 2020 | Baton Rouge, LA

completed the mold inspection and we have two rooms wet and a closet we going to have to remove the carpet and pad in the Bedroom and closet and set up for drying we will need 6 fans and one DH and neg air, 3 to 4 days of drying. demo is complete ...

Sherman S.

June 23, 2020 | Holden, LA

There will be lots of demos. Setting equipment and stabilizing the project. 13 fans, two negative real fans, and two dehumidifiers the remaining of the demo should be completed this afternoon. we use 15 fans, 2 DH and 2 net. air fans. There were a 3 day time Some demo. all dry and beautifully remodled.

Rose E.

June 23, 2020 | Port Allen, LA

We will be removing the countertop, the vanity, and 3x7 drywall and cleaning everything. Master Bathroom, clean everything mold. Vanity 1: We remove the countertop, vanity, and 3x7 drywall and clean everything for mold. Bath 1, We are removing 3x4 drywall clean everything for mold. We will use two fans, 2 DH and 2 ...

Dave E.

June 23, 2020 | Baton Rouge, LA

Subfloor in bedroom (buckling in 2 spots) and second bedroom (buckling in at least 1 spot) we will perform the repair work and hang, tape and float sheetrock that needs replaced.

Total: 750