Recent Jobs For United Fire & Water

Marchita M.- water damage, water restoration, zachary

September 30, 2020 | Zachary, LA

To expedite the drying process, our team determined that tenting the floors would be necessary. Tenting helps create a controlled environment, increasing the effectiveness of the drying equipment by trapping heat and moisture in a specific area. This method would ensure the moisture was thoroughly removed from the flooring and ...

Pearl G.

September 29, 2020 | Destrehan, LA

installed 17 fans and a Dehumidifier. let run for 3 days and now everything is dry. no demo is needed.

Michael S.

September 16, 2020 | Central, LA

Set up neg air and DH. found mold in the bedroom. fixed leak in wall and replaced wet drywall. we cleaned and sanitized the entire house. after a week of running everything was dr and back to normal

Carolyn M.

September 16, 2020 | Prairieville, LA

Remove cabinet in kitchen. pull dishwasher to inspect. remove flooring in bedroom and closet. remove baseboards in closet. inspect. Screw test in sil plates in both closet and behind kitchen cabinet. equipment: 2 Dehus 2 Scrubbers 3 fans in closet 2 fans in kitchen

Whitney W.

September 16, 2020 | Baton Rouge, LA

set up 2 fans 1 dehumidifier and 1 air scrubber should be done in 3 days. A small amount of repair work was completed - float, texture, and paint.

Amy H.

September 10, 2020 | Baton Rouge, LA

fans and dehu have been running for a week to dry out and stabilize. sprayed antimicrobial around the house to stop any mold growth

Commercial Business

September 8, 2020 | Baton Rouge, LA

Set up 3 dehumidifiers, 6 air movers and 3 air scrubbers. machines ran for 4 days and everything is dry. replaced 6 ceiling tile and fix leak in AC drain line.

Wanesta H.

September 7, 2020 | Baton Rouge, LA

Remove cabinet in kitchen. pull dishwasher to inspect. remove flooring in bedroom and closet. remove baseboards in closet. inspect. Screw test in sil plates in both closet and behind kitchen cabinet. equipment: 2 Dehus 2 Scrubbers 3 fans in closet 2 fans in kitchen replace carpet in master bedroom and hardwood in kitchen, master ...

Lyndsay N.- Water Damage- Tub Overflow- Mitigation

September 7, 2020 | Denham Springs, LA

This Denham Springs, LA, project required meticulous drying over a 3 to 4-day period. Using state-of-the-art equipment, we successfully dried the carpet while preserving the underlying structure and ensuring no damage occurred to the drywall. Our team closely monitored the moisture levels throughout the process to guarantee optimal results. By the ...

Christie D.

September 3, 2020 | Baton Rouge, LA

set up 1 neg air fan and 1 DH. demoing the ceramic tile in a shower and tub surround. Everything is dry, I am picking up all the equipment

Michelle E.

September 3, 2020 | Baton Rouge, LA

setup DH and NEG.AIR FAN. carpet was removed from master bedroom. fixed leak and left drying machine for 3 days. came back to check and all was dry. picked up machines.

Cheryl B.

August 25, 2020 | Baton Rouge, LA

set up contaminant and the ceiling had fell down .clean up the drywall and insulation that came down need to go back to take off wet wood in the attic. All Sheet vinyl flooring to be removed. Wet Sheetrock in bathroom to be removed. Wet Sheetrock in hall to be ...

Amy S.

August 25, 2020 | Baton Rouge, LA

flooring in the picture by the fireplace seems soft (floating floor) which is where the stated the floor was getting hot due to the slab leak. 2 dehumidifier and 2 air scrubbers. fixed the slab and after a few days the floors were dry.

Mark C.

August 17, 2020 | Baton Rouge, LA

left 1 dehumidifier, 1 air scrubber, 1 fan and I removed all wet insulation that was in the attic. 16sf of drywall ceiling removed in bathroom and 2sf (water mark) of Sheetrock in the living room. This must be done because there was an asbestos test done. Attic is dry after a few ...

Commercial Business

August 3, 2020 | Baton Rouge, LA

set up 23 fans, 2 dehumidifiers, and 2 air scrubbers. Building flooded and soaked carpet. Made 2ft drywall cut. drying out. took 3 days of continuous running of machines. All dry.