Recent Jobs For United Fire & Water

Wendell S.

August 17, 2022 | Baton Rouge, LA

A professional from United Fire & Water reviewed the space and determined the work scope. The scope included a flood cut in the bathroom and part of the bedroom, pulling some floors in the master bedroom, and removal of the tub. Drying equipment was placed to dry the remaining structures and ...

Cindy J.

August 17, 2022 | Baton Rouge, LA

A technician from United Fire & Water went to the home to assess the situation. They noted the airconditioner closet leaked into the master bedroom, living room, and kitchen; affecting the kitchen cabinets, surrounding baseboards, and the wood flooring. The wood flooring in the master bedroom was starting to buckle and ...

Bobby H.

August 16, 2022 | Baton Rouge, LA

A United Fire & Water professional checked the water supply line in the kitchen leaked along the exterior wall, mostly running out of the house. The kitchen cabinets were wet and needed to be detached to ensure proper drying. Several baseboards along the exterior wall needed removal. The flooring in the ...

Greg H.

August 15, 2022 | Baton Rouge, LA

Upon further investigation by a United Fire & Water technician, it was identified that the kitchen had an island sink that leaked, affecting the cabinetry and real wood flooring. The flooring was warped around the cabinetry. They removed the cabinetry toe kicks and set up drying equipment to dry out the ...

Mirasad B.

August 11, 2022 | Baton Rouge, LA

A United Fire & Water tech set up drying equipment to remove the water. Drying took a couple of days, and no demolition was needed after the moisture levels were reduced.

Jude H.- water restoration, water restoration, zachary

August 2, 2022 | Zachary, LA

To address the damage, our team performed minor demolition, including the removal of the crown molding around the full-height cabinet in the bathroom. This was necessary to allow access to the wet materials and ensure thorough drying. In addition, the insulation from the attic that had been affected by the ...

Commercial Business

July 28, 2022 | Baton Rouge, LA

A team from United Fire & Water went onsite to assess the scope of the project which included breaking the slab to remove the grease trap and setting up a containment area. The containment area setup included 2 zipper doors and 1 VeloPro air scrubber.

Colin L.

July 25, 2022 | Baton Rouge, LA

A team from United Fire & Water cleaned and packed up the office, extracted the carpet in the master bedroom, and moved the furniture to the hallway. They took out the wet insulation in the attic and performed demolition in the office including tearing the entire sheetrock ceiling in the office, ...

Fontana

July 21, 2022 | Baton Rouge, LA

We will need to packout the kitchen into the the living room. Set containment. Mold is 7ft up the wall so all the cabinets will need to come out. Do the kitchen first and inspect the shower wall.. We Need a docusketch. We will also need to set containment in ...

Larry B.

July 21, 2022 | Baton Rouge, LA

A technician from United Fire & Water reviewed the jacuzzi tub and identified leaks in the slab. The jacuzzi tub was removed, and the wet structures were dried out and sprayed with an anti-microbial solution. The bathroom was completely remodeled after the slab was fixed and the structures were dried.

Heath J.

July 21, 2022 | Baton Rouge, LA

A team from United Fire & Water responded identifying 5 affected rooms. They removed the vinyl floor in the hallway, living room, and kitchen. Upon investigation, the team identified the source of water came from the laundry room. Baseboards and walls in the bedroom and two in the living room were removed ...

Erin C.

July 21, 2022 | Baton Rouge, LA

A United Fire & Water professional went with a portable unit for extraction and removed all shoe molding in the bathroom. This included the removal of the baseboard behind the toilet and the baseboard in front of both side walls of the shower. They set two air movers and one dehumidifier ...

Jim A.

July 19, 2022 | Baton Rouge, LA

United Fire & Water identified a supply line to the toilet leaked in the master bathroom, seeping under the laminate floors in the master bedroom, master closet, hallway, and bedroom. Our team removed laminate flooring in the master bedroom, master closet, hallway, hallway closet, two bedrooms, and office. They also set ...

Sita W.

July 19, 2022 | Baton Rouge, LA

A professional from United Fire & Water performed demolition to remove drywall, base, and crown molding. Crown and base molding was removed, the drywall was removed and significant microbial growth was found on a large portion of the shiplap. They set containment over the exposed area with Velo air scrubbers on ...

Joy B.

July 19, 2022 | Baton Rouge, LA

A technician from United Fire & Water noted the toilet leaked out of the bathroom, into the hallway, bedroom, and adjacent office saturating baseboards and floor rugs. The technician extracted water from the engineered wood flooring, and out of the rugs. They cleaned the flooring and all affected furniture and contents ...